Magnetic particle inspection of mold steel is useful only when the material is suitable, the inspection coverage is defined and indications are evaluated against an agreed acceptance criterion. A report stating “MPI passed” does not by itself show which insert was examined, which surfaces were accessible or which processing stage the result covers.
This FUMING guide helps tooling buyers review the scope and evidence for a specialist nondestructive examination. It is a purchasing and report-review checklist, not an operating procedure. The responsible qualified NDT provider must establish the actual technique and applicable requirements for the component. Discuss that scope as part of mold making planning before an inspection becomes a last-minute shipping condition.
Confirm that the material is eligible for the method
Magnetic particle inspection, also called MPI or MT, relies on a magnetic response. Magnaflux’s MPI guidance identifies ferromagnetic materials as suitable and explains that non-ferromagnetic materials cannot be examined by this method. Do not assume every material called steel, stainless steel or mold alloy has the required response.
Give the inspection provider the material designation and available material certificate, together with the component’s processing history. Ask the provider to confirm method suitability. A label such as “mold insert” describes the component’s purpose, not its metallurgy. Likewise, a magnet sticking to an item is not a complete approved inspection procedure.
Keep material identity connected to the physical item. A heat number on a certificate should be traceable through cutting and machining to the insert being inspected. If that link is missing, record the uncertainty and resolve it before presenting the report as acceptance evidence for a specific delivered component.
Distinguish surface examination from bulk-material evidence
MPI addresses surface and near-surface discontinuities in suitable material; it is not a general certificate for the entire internal volume of a large steel block. FHWA’s magnetic particle testing overview describes the principle of magnetic flux leakage and the method’s surface-related application. Its infrastructure context is different from tooling, so it supports the general principle rather than supplying a mold acceptance standard.
For buyers already reviewing mold steel ultrasonic testing reports, the key question is what each examination is intended to cover. Do not substitute one report for another merely because both are called nondestructive testing. Ask the technical authority to define complementary inspections when the risk requires them.
For example, a stock block may have a material inspection record from before machining, while a finished insert has a later surface examination. Retain both stages and their boundaries. The earlier record does not automatically address features exposed or processing performed afterward, and the later surface examination does not retrospectively describe every region inside the original stock.
Request a coverage map rather than a blanket statement
Use an identifiable component drawing to mark the requested areas: cavity surfaces, corners, transitions, repaired zones or other locations selected by the responsible engineer. Ask the provider to record inaccessible or excluded regions. An assembled mold may restrict access differently from an individual insert on the inspection bench.

Coverage also depends on the qualified technique and relevant field directions. Magnaflux’s discussion of common MPI misunderstandings explains that direction and equipment configuration affect the inspection approach. The buyer should request evidence that the agreed scope was covered, not dictate a universal number of magnetization steps based on a generic checklist.
Ask the inspection provider to specify the procedure identifier and revision and to confirm that the part geometry is included in its application. If a cavity wall, deep recess or thin feature cannot be examined as requested, the report should say so. An explicit limitation is more useful than an unqualified pass that implies coverage the setup could not achieve.
Agree what an indication means before the examination
An observed indication requires evaluation; the presence of particles at a location is not automatically a rejectable crack. The report should distinguish the observation, its classification and the acceptance decision. The qualified evaluator should use the agreed criteria, including any applicable customer or product requirements.
Identify the acceptance document separately from the test method. A document explaining how to perform an examination may not supply the product-specific reject limits the buyer needs. Record the edition or revision used, and resolve conflicting references before the inspector is asked to release the item.
| Report field | Evidence to request | Question it answers |
|---|---|---|
| Item identity | Insert ID, drawing revision and material traceability | Which component was examined? |
| Processing stage | State before or after relevant machining, heat treatment or repair | Which delivered condition does the result cover? |
| Method | Procedure revision and relevant technique details | How was the scope addressed? |
| Coverage | Marked areas and exclusions | What was examined and what was not? |
| Indications | Locations, recorded characteristics and evaluation | How does the evidence support the disposition? |
| Release | Acceptance reference, authorized decision and report approval | Who accepted the item and on what basis? |
Request the provider’s relevant personnel qualification and equipment-control evidence as required by the contract. Keep the request specific to the work being purchased. A company logo or generic certification statement should not replace the traceable approval of the actual examination report.
Place the inspection at a meaningful process stage
List the operations that occur before and after examination. These may include heat treatment, EDM, welding, grinding, polishing or coating. The technical authority should decide the inspection stage and whether later work requires another examination. Do not assume one early pass remains sufficient after every subsequent process change.
Use the heat-treatment and hardness record to describe the thermal processing history, while keeping its acceptance separate from MPI. A hardness result and a magnetic particle examination answer different questions. Neither should be used as a shortcut for the other.
If inspection follows an approved local repair, identify the repaired area and the associated authorization. Preserve the original indication record, the repair record and the subsequent examination result. Do not erase the first report when a later examination is acceptable; the sequence is part of the component’s history.
Specify the condition in which the insert returns
Inspection is not finished from the buyer’s perspective until the component is suitable for the next operation. Agree the required cleaning, residual-magnetism control where applicable, corrosion protection and handling condition with the inspection provider and tooling team. These requirements should be compatible with the component’s finish and intended next process.

Record any protective product applied after examination so the receiving team knows how to handle it. Do not allow an undocumented cleaning or protection step to interfere with later polishing, coating or assembly. Protected packaging should maintain identification and prevent contact damage to important surfaces.
Include the returned condition and report package in the tooling quality assurance plan. For a mold transfer or subcontracted examination, name the person who reviews the evidence and releases the insert to the next stage. This avoids treating delivery of the report as automatic technical acceptance.
Frequently asked questions
Does an MPI pass guarantee mold life?
No. It documents an examination within a stated scope and acceptance basis. Mold life also depends on design, material condition, processing and service conditions that are not all evaluated by that examination.
Can coated or assembled components always be inspected?
Do not assume so. Ask the qualified provider to assess the actual coating, access and geometry against the approved procedure. Record limitations and agree any necessary preparation before work begins; do not authorize removal of a functional coating through an informal inspection request.
What should a buyer send to FUMING?
Send the insert drawing, material designation, processing history and required inspection reference. Identify critical regions, any repair history and the intended delivery condition. These details support a review of inspection scope and specialist requirements without implying that a generic pass certificate covers every tooling risk.