Eddy Current Inspection of Machined Parts: Scope, References and Coverage

An eddy current inspection report for a machined component should define the examination objective, reference standard, scanned areas and limitations before it states acceptance. A clean instrument response is meaningful only within a demonstrated inspection setup. It does not prove that every possible defect, at every location and depth, has been excluded.

For a CNC machining project with FUMING, agree whether eddy current examination is required and which qualified party will define and perform it. This guide supports buyer review of the inspection package. It does not prescribe probe settings, replace a qualified procedure or claim a particular detection capability for the supplier.

Define the inspection question separately from material testing

Eddy current methods can address different questions. A report intended to detect discontinuities is not interchangeable with a conductivity result used to compare material condition. Identify the required examination on the order and avoid accepting an unrelated electrical measurement because both use similar equipment terminology.

The Eddy Current FAQs technical resource explains that changes in electromagnetic response can reflect discontinuities as well as changes in material properties. The buyer’s task is to establish which response the procedure is designed to evaluate and what evidence demonstrates that purpose.

Keep the material conductivity report separate when it is also required. A favorable conductivity value does not close an unresolved flaw-detection requirement, and a satisfactory flaw scan does not independently verify alloy identity or the complete heat-treatment condition.

Slotted and curved metal blocks beside a separate cylindrical probe
AI-generated illustration: Slotted and curved metal blocks beside a separate cylindrical probe.

Match the reference to the actual examination

Ask the inspection provider to identify the reference standard and explain its relevance to the production component. Material, geometry and the reference feature can influence the comparison. A block that produces a convenient response is not automatically appropriate for the surface and flaw orientation of concern.

Retain the reference identifier, its controlled documentation and the features used for setup. Distinguish an artificial reference feature from a naturally occurring discontinuity. A response from the former can support procedure setup without proving equivalence to every real flaw that might occur in service.

The purchase specification should identify who approves reference suitability. Do not let an undocumented substitution become part of routine release. If the required reference is unavailable, record the limitation and resolve it through the responsible technical authority before treating the examination as complete.

Record geometry and surface condition

The same nominal material can present very different inspection conditions at an open flat face, a corner or a recessed feature. Put the areas of interest on a controlled sketch or drawing. The examination plan should distinguish accessible surfaces from those that the selected probe cannot adequately cover.

TWI’s explanation of factors affecting eddy currents includes probe proximity, conductivity and permeability. This supports retaining the conditions that affect the response rather than interpreting every signal change as a crack.

Document the permitted finish, cleanliness and coating condition. If the part is examined before a later operation, identify that stage. A scan performed on an earlier surface does not automatically describe the delivered surface after machining, finishing or repair has altered the area.

Make coverage visible rather than implied

Specify the surfaces, paths and relevant orientations included in the examination. A statement such as inspected by eddy current is insufficient when a buyer needs to know whether a bore entrance, transition or another critical region was evaluated. Use location references that can be matched to the drawing.

Record excluded areas and the reason for each exclusion. Access restrictions, geometry-related responses and an unsuitable surface condition should remain visible in the report. Do not convert partial access into a statement of complete coverage simply because the rest of the component produced acceptable observations.

Where several passes or orientations are required by the approved procedure, retain their completion record. The buyer should be able to distinguish the planned scope from the scope actually executed. A report template with every box filled does not replace evidence that the intended areas were examined.

Three metal components separated in a tray with blank cards
AI-generated illustration: Three metal components separated in a tray with blank cards.

Preserve setup checks and interruptions

Identify the instrument, probe, procedure revision and the settings required in the inspection record. Retain the setup and response checks defined by that procedure. This article does not propose frequencies, scan speeds or acceptance thresholds; those belong to the qualified examination plan.

If the equipment or probe is changed during the work, record the event and the applicable checks. The technical reviewer should determine whether earlier results remain valid and whether a defined portion of the work needs repeating. Do not treat a hardware change as an invisible administrative detail.

An unexpected loss of reference response needs a documented disposition. Preserve the last satisfactory check, the affected inspection interval and the corrective action. The logic resembles an inspection-equipment impact review, although the specific technical decision must follow the eddy current procedure.

Separate indications from rejection decisions

Record an indication with enough location and response information for the qualified reviewer to evaluate it. An indication is an observation, while rejection is a decision made against the governing criterion. Those should not be collapsed into one unexplained word on the certificate.

Likewise, do not report defect dimensions that the method has not established. If sizing or characterization is required, the procedure must support that claim. Otherwise retain the observation and its limits, and use an approved additional examination when the unresolved question requires it.

Agree how reportable indications will be communicated and dispositioned. A technician should not remove material or rework a component merely to eliminate a response without authorization. Keep any later work traceable to the original finding and identify what was re-examined afterward.

Build a reviewable acceptance record

Item Evidence Question answered
Component Part, revision, lot and processing stage What was examined?
Procedure Controlled method and applicable criterion What decision is supported?
Reference Identity and approved relevance How was the response established?
Coverage Locations, orientations and exclusions Where does the result apply?
Checks Required response checks and interruptions Was the setup maintained?
Disposition Indications, review and authorized action What is released or unresolved?

Retain original data where the agreed method produces it, together with the report revision and reviewer identity. A screenshot may help explain a response but should remain connected to its location and setup. An isolated image without that context cannot establish the complete examination history.

Include the record in the quality assurance package while keeping dimensional, material and other acceptance requirements distinct. One completed examination should not erase a missing requirement elsewhere in the release plan.

The NASA eddy current process specification provides a concrete example of documenting inspection coverage and limitations. It is an example of structured reporting, not a declaration that its application-specific requirements govern every commercial machined part. Use the specification actually agreed for the order.

Before shipment, identify who reviewed any remaining exclusions and whether additional evidence is still required. Keep that decision attached to the affected serial numbers or lot. A complete administrative package should make unresolved technical scope visible rather than bury it in a general certificate of conformity.

Buyer questions

Does a report with no indications prove the part is defect-free?

No. It supports the stated inspection scope and demonstrated method capability. Review coverage and limitations before interpreting the result.

Can conductivity testing replace a flaw-detection examination?

No. They answer different questions and require evidence appropriate to their objectives.

What should be agreed before inspection starts?

Define the component condition, objective, procedure, reference, coverage and acceptance criterion. Contact FUMING to align the required inspection package with the purchasing specification.